Become more involved in the building of your bold new home. We offer three completion levels to fit the needs of all home owners...
This stage includes finished drywall, with rough “stubbed out” plumbing, heating duct, and electrical rough in. Home owner customizes interior doors and trim as well as all plumbing and electrical fixtures, cabinets, countertops, floor coverings, interior painting, and personal upgrades.
-Electrical pre-wire to include the following: (2) flood lights
(2) telephone outlets
(3) cable outlets
-Standard door bell at front door
-Bath exhaust fans per code requirements
Plumbing
-Manablok and Pex system throughout
-(2) Exterior water faucets
Insulation
-R13 walls
-R30 ceilings blown or batts depending on plan details
Heating & Cooling
-All duct work and rough in electrical and plumbing for unit to include copper tubing
Windows
-Standard single hung new construction vinyl windows with jambs and high efficient LoE rated glass in white
Permits/Inspections
Building permits
Stage 2 (For the Weekender)
This stage includes finished drywall, finished plumbing, heating and air, and electrical. Stage 2 also includes completed interior doors, trim, cabinets and countertops. Home owner customizes floor coverings, interior painting and personal upgrades.
Foundation
- Reinforced concrete footings
- Solid concrete block foundation
Exterior Wall
-Vinyl Siding
-Vinyl eaves and overhangs
Roof System
-Engineered trusses and/or stick framed
-Architectural fiberglass shingle
-Gable and ridge vents per plans
Electrical
-All electric home
-Electrical pre-wire to include the following: (2) flood lights
(2) telephone outlets
(3) cable outlets
-Standard door bell at front door
-Bath exhaust fans per code requirements
Plumbing
-Manablok and Pex system throughout
-(2) Exterior water faucets
Insulation
-R13 walls
-R30 ceilings blown or batts depending on plan details
Heating & Cooling
-All duct work and rough in electrical and plumbing for unit to include copper tubing
Windows
-Standard single hung new construction vinyl windows with jambs and high efficient LoE rated glass in white
Interior Walls
- ½ inch drywall finished throughout
-Stipple ceilings throughout
Interior Doors & Trim
-Standard 6 panel
Permits/Inspections
Building permits
Stage 3 (For the Professional who enjoys a finished product) For the Professional who enjoys a finished product: This is our 100% complete home. Includes completed exterior and interior all the way to completed floor coverings and interior painting
Foundation
- Reinforced concrete footings
- Solid concrete block foundation
Exterior Wall
-Vinyl Siding
-Vinyl eaves and overhangs
Roof System
-Engineered trusses and/or stick framed
-Architectural fiberglass shingle
-Gable and ridge vents per plans
Electrical
-All electric home
-Electrical pre-wire to include the following: (2) flood lights
(2) telephone outlets
(3) cable outlets
-Standard door bell at front door
-Bath exhaust fans per code requirements
Plumbing
-Manablok and Pex system throughout
-(2) Exterior water faucets
Insulation
-R13 walls
-R30 ceilings blown or batts depending on plan details
Heating & Cooling
-All duct work and rough in electrical and plumbing for unit to include copper tubing
Windows
-Standard single hung new construction vinyl windows with jambs and high efficient LoE rated glass in white
Interior Walls
- ½ inch drywall finished throughout
-Stipple ceilings throughout
Interior Doors & Trim
-Standard 6 panel
Interior Paint
-Complete interior wall paint included
-Up the three (3) wall colors, with white semi-gloss trim Floor Covering
-Complete standard floor coverings (upgrades available)
Move in ready!Pre-designed plans starting from just $50,000 !!